Retrieving RFP details
Release
Close
City of Oklahoma City
Works include approx. 1,773 LF of 8" carrier pipe Boring; 5,376 LF of 8" C900 PVC water line pipe push on joint, DR14; 97 EA 1" water service line short; 1 LS clearing and grubbing; 4,826 SY solid slab sodding. See outside link.
Miami-Dade County
Work consists of roadway improvements. The work consists of reconstruction of the existing road to a 4-lane roadway with continuous center turning lane, bike lanes, sidewalks, curb & gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting.
City of McCleary
Provide architectural and engineering professional services to prepare engineering (PE), right-of-way acquisition services, and construction engineering services for the South Third Street - Oak Street tot Simpson Avenue project includes roadway improvements, pedestrian facilities, drainage improvements, and utility relocations as necessary. Improvements include sidewalks, street lighting, street amenities (landscaping, signage, etc.), and stormwater management systems.
City of Carbondale
Replacement of 541 LF of sanitary sewer line and 5 manholes, also 3 inlets and mill and overlay of approx. 2,239 SY of Avenue and Street.
Southeast Overtown/Park West Community Redevelopment Agency
The SEOPW CRA is seeking to procure a qualified and experienced CMAR firm to provide pre-construction services and, if applicable, construction services for Crown Overtown – the NW 9th Street Transformation. The selected CMAR firm shall have at a minimum, a proven track record of...
Release
Oct 08, 2025
Close
Oct 29, 2025