Town of Albion
The work for this project includes electrical, mechanical piping, fencing, chlorination, grading, site work, 6" and 8" water mains, a fire hydrant, building improvements, a packaged booster pump system, an emergency backup generator, retaining walls, fencing, water meter replacement (including new water meters, meter boxes, meter setters, and an automated meter reading system), and surface restoration; along with other miscellaneous work to complete the project. The work may include additive alternates for replacement of additional water meter boxes and roadway improvements to the owner's reservoir tank (including grading and earthwork, geotextile, and gravel surfacing).
Town of Melvin
Water system improvements. Installation of approx. 4,000 LF of 6" PVC water line, valves, hydrants and appurtenances.
City of Muskegon Heights
Water supply system improvements.
Knoxville Utilities Board (KUB)
800 LF - 12" water line under pavement or within 3' of edge of pavement per section 31 23 33, trenching and backfilling; 570 LF - 8" water line under pavement or within 3' of edge of pavement, trenching and backfilling; 217 LF - 12" water line under pavement or within 3' of edge of pavement per section 31 23 33, trenching and backfilling (restrained joint); 177 LF - 8" water line under pavement or within 3' of edge of pavement per section 31 23 33, trenching and backfilling (restrained joint); 7 ea - gate valve; 3 ea - 12" gate valve. See attached file.
Release
Oct 15, 2025
Close
Nov 13, 2025