City of Baltimore
Work includes abandonment and/or removal of existing water mains and installation of various sized new ductile iron pipes, valves, fittings and appurtenances, pipe restraints, replacement/installation of fire hydrants, small (residential) meter settings and meter vaults, renew and replacement of existing water services, temporary bypass piping, erosion and sediment control measures, maintenance of traffic measures, sidewalk restoration, curb and gutter, and roadway paving, as required.
Release
Apr 04, 2025
Close
May 07, 2025