City of Columbus
Work for which consists of replacing approx 9,900 LF of 2", 6-inch, 8" and 12" water mains, as well as the replacement of privately owned lead and galvanized water service lines
University Of North Carolina At Pembroke
Furnishing of labor, material and equipment entering into the construction of water line improvements.
City of San Mateo
Work consists of Water Pumping Improvements, including replacement of the existing (4) 3 water pumps and associated pipe supports, piping, valves and appurtenance and pads, connections to existing systems, instruments, conduit and wiring, electrical and instrumentation, demotion of existing piping and appurtenances, installation of new valves on 14" reclaimed water line, excavation, backfill and pavement restoration.
Town of Melvin
Water system improvements. Installation of approx. 4,000 LF of 6" PVC water line, valves, hydrants and appurtenances.