City of Culver City
Work consists of stormwater and urban runoff diversion project & median improvements. Includes, 17,100 SF of remove and dispose of concrete paving and base material; 17,030 SF of construct 10" thick high early strength concrete paving over 6" cmb; 10,000 SF of remove and dispose of existing concrete paving and road sub-base; 8,363 SF of construct 10" pcc over 6" ab; 5,000 SF of 3" deep bark mulch; 5,000 SF of soil preparation: scarify 6", amend per specifications, fine grade; 5,000 SF of remove 18" soil at planting areas; 5,660 SF of remove ex. Ac and base and replace with 4" ac over 6" ab; 2,200 SF of construct and repair ppc pavement; 3,200 SF of concrete pavement, curb and/or sidewalk repair at trench/bore; 1,020 SF of construct 4" pcc sidewalk on 6" cab; 150 CY of remove and dispose existing paving and base for trench to depth required. See outside link.
Release
Apr 10, 2025
Close
Jun 05, 2025