Retrieving RFP details
Release
Close
Yakama Nation Fisheries
Develop dam alternatives for the Wanawish Dam, located at river mile (RM) of the Yakima River. Develop alternatives that improve irrigation reliability, fish passage, fish harvest, and fish monitoring, and minimize operation and maintenance costs. The facility comprises a low-head diversion dam, fish ladders, and canal headworks on both riverbanks with their associated ancillary features, including fish screening and bypass systems. The Yakama Nation desires to improve fish passage, fish monitoring, and operations at the Wanawish Dam through design and construction/reconstruction of headworks, spillway, and fish passage improvements to achieve long-term, multidisciplinary objectives.
City of Weleetka
Dam improvements including concrete spillway and flume, gravel access road, and earthen emergency spillway.
Arkansas Game and Fish Commission
To obtain a qualified consultant to aid in the preparation of a new strategic plan for the AGFC fisheries division. This plan will establish clear objectives and strategies aligned with pre-defined goals to guide the Division's operations, resource allocation, and conservation efforts over the next five years. Consultants may also be asked to lead Division staff through exercises to review and revise the Division’s Mission, Vision and/or Values statements.
Town of Fountain Hills
Providing professional services consisting of "dam sediment removal & maintenance" (the "services"); sediment removal: excavation and proper off-site disposal of accumulated sediment from upstream and downstream storage areas, including all hauling and dust control. ; structural maintenance: cleaning, repair, and/or reconstruction of inlet and outlet control structures, including trash racks, energy dissipators, sluiceways, spillways, and reinforced channels; headwall and culvert repair: repair or reinforcement of damaged concrete headwalls, culverts, wingwalls, and low-flow channels as identified in inspection reports or task orders. See outside link.
Release
Sep 16, 2025
Close
Oct 31, 2025