Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Kentucky Transportation Cabinet
Work includes 246.95 TN, crushed stone base; 60 TN, traffic bound base; 4 TN, asphalt seal aggregate; 252 TN, Cl2 asph base 1.00D PG64-22; 46 TN, CL2 asphalt surface 0.38D PG64-22; 5 EA, delineator for guardrail bi directional white; 6 EA, barricade-type III; 200 Cy, Roadway excavation; 37.50 LF, guardrail-steel w beam-s face; 241.50 LF, remove guardrail; 1,500 SF, temporary signs; 18 TN, asphalt pave milling & texturing; 205 LF, trenching and backfilling; 623 LF, pave striping-thermo-6 IN W; 632 LF, pave striping-thermo-6 IN Y; 199 LF, pave striping-dur TY 1-6 IN W; 28,297 LB, steel reinforcement-epoxy coated. See attached files.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
New York State Department of Transportation
Bridge Replacement.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
New York State Department of Transportation
Close: Dec 18, 2025
Bridge Replacement.
AvailableNew York State Department of Transportation
Bridge replacement.
Posted Date
Oct 16, 2025
Due Date
Nov 20, 2025
Release: Oct 16, 2025
New York State Department of Transportation
Close: Nov 20, 2025
Bridge replacement.
AvailableIndiana Department of Transportation
Bridge replacement. Work includes 1 LS clearing right of way; 240 CY of common excavation; 815 CY of waterway excavation; stormwater management; 535 CY of wet excavation; 213 SY of 1 1/2" asphalt milling; 856 LF of joint adhesive; 157 LF of 6'3" spacing MGS W-beam guardrail; 164 SY of 10" reinforced concrete bridge approach; piling; signage. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Bridge replacement. Work includes 1 LS clearing right of way; 240 CY of common excavation; 815 CY of waterway excavation; stormwater management; 535 CY of wet excavation; 213 SY of 1 1/2" asphalt milling; 856 LF of joint adhesive; 157 LF of 6'3" spacing MGS W-beam guardrail; 164 SY of 10" reinforced concrete bridge approach; piling; signage. See attached files.
AvailableWyoming Department of Transportation
Replacement of Bridge
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Wyoming Department of Transportation
Close: Feb 2, 2026
Replacement of Bridge
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis