Retrieving RFP details
Release
Close
Valvoline Instant Oil Change
Instant Oil Change - New Construction.
Valvoline Instant Oil Change
Complete site work improvements with utilities (0.56 ac disturbed) to include concrete paving, asphalt paving, striping, landscaping, and other site improvements per plans, and specifications within documents. New wood framed, structural steel, and wood truss supported building with included finished sales space (1st Floor = 1794 sf & Basement = 1868 sf). Exterior finishes include brick veneer wainscot and fiber cement siding. Interiors include stained concrete, paint, wall framing, drywall, ceilings, and full MEP’s.
Piedmont Triad Airport Authority
Express Oil Change - New Construction
Express Oil Change & Tire Engineers
Express Oil - New Construction
Release
-
Close
Nov 04, 2025