Retrieving RFP details
Release
Close
Lucas County
Work consists of furnishing and installing all required components comprising construction of an ultraviolet disinfection facility including a concrete masonry building, excavation, underground utility relocation, installation of uv disinfection equipment, instrumentation, piping, valves, air handling, electrical and other necessary appurtenances and related ancillary equipment as indicated on the project drawings as necessary for proper and complete performance.
Logan Township Municipal Utilities Authority
Main project elements at the Water Reclamation Facility (WRF): (a) Furnishing and installing a second disc filter at the Filter/UV Disinfection Building. (b) Furnishing and installing a second UV disinfection unit at the Filter/UV Disinfection Building. (c) Addition of three vertical turbine service water pumps at the Final Effluent Pump Station wet well and associated piping, valves, manual basket strainer and appurtenances inside a new building enclosure, and new pump control panel and variable speed drives at the Effluent Control Room. (d) Replacement of existing louvers and ventilation fans at the Filter/UV Disinfection Building. (e) Recoating existing building structural steel and bridge crane at the Filter/UV Disinfection Building. (f) Addition of motorized operators at existing slide gates in the Filter/UV Disinfection Building and at Polishing Pond No. 2. (g) Other appurtenant work as required by the contract drawings and specifications.
St Vrain Sanitation District
Upgrades to the existing influent pump station equipment, the conversion and rehabilitation of an unused building into a new motor control center (MCC) room, and improvements to the existing UV disinfection system. The work will require a full sewage bypass of the influent pump station as well as temporary bypassing and treatment measures to maintain continuous operation of the disinfection process.
County of Ventura
Project consists of construction of a uv disinfection system for tertiary treatment of recycled water and to upgrade the existing pump station 1 with an additional pump and motor controls.
Release
Oct 12, 2025
Close
Nov 13, 2025