Santa Clara Valley Transportation Authority
Work includes 260 EA channelizer (surface mounted); 14 EA portable changeable message sign; 46,400 LF temporary railing (type k); 14 EA temporary radar speed feedback sign system; 1 LS temporary de watering and non-storm water discharge; 917 SY temporary hydraulic mulch (bonded fiber matrix); 1,700 LF temporary check dam; 400 EA temporary drainage inlet protection; 932 LF temporary fiber roll; 66,300 LF remove yellow thermoplastic traffic stripe (hazardous waste); 12,500 LF temporary high- visibility fence. See attached file.
Release
Oct 18, 2024
Close
Dec 11, 2024