Retrieving RFP details
Release
Close
City of Mobile
Contractor shall include the cost to furnish all labor, materials, tools and equipment necessary for a complete restoration of the fountain base façade and at Unity Point Park as outlined in this RFQ document. Remove and reinstall 20-18”x36” precast concrete caps. Replace 4-2”x24” precast concrete façade panels. Remove and reattach 15-2”x24” precast concrete façade panels. Replace 1-8”x8”x12” precast concert fence post pedestal. Concrete pedestal shall have 1” chamfer corners to match existing. Remove and reinstall 1 ornamental aluminum 6’ wide fence section. Provide and install 2 new 6’ wide ornamental aluminum fence sections. Provide and install a new Altivar 630 Variable Speed Drive: Model ATV630U75M3 or similar upon prior bid approval. o Contractor shall submit substitution prior to bidding. Approved substitutions shall be made valid through issued addendum.
PR-054-25_UnityRFQComplete
Delaware County
Repair and cleaning of the masonry for the entrance of the fronefield building, the exterior fountain outside of the building, and a stone lamp base adjacent to the building and the fountain. The work includes assessment, removal of damaged materials, replacement, and restoration of the masonry, and ensuring the aesthetic and structural integrity of all items.
City of Stockton
Provide pool and spa maintenance contractor to provide commercial pool/fountain maintenance services including but not limited to: all needed chemicals, service of the water filter equipment, chemical injection equipment, ultraviolet (uv) equipment, operating the computer controller, periodic flushing and cleaning of the fountain basin, and provide repairs to the equipment
Release
-
Close
Dec 03, 2025