St. James Parish
Installation of two (2) 48” steel pipe culverts (jack/bore) beneath the Railroad and extend existing 36” RCP on each side, erosion control, RCP extension, temporary sheeting, drainage excavation, rip rap, Union Pacific Railroad flagmen and other requirements, and related work.
Release
May 07, 2025
Close
Jun 12, 2025