University of Central Florida
Remove & replace existing granite Pegasus and adjoining concrete in walkway at the front of Arena Plaza promenade. From the bottom of the 3rd Grey Strip from the entry of the arena to the deco drain at the last grey strip before the plants near road. To include the Pegasus and concrete with-in the inner and outer stainless-steel circle rings around the Pegasus logo, and from light pole to light pole on the sides. Concrete to include Salt Finish and a lite broom finish concrete as existing surfaces. Dowel new concrete into existing concrete. Colored concrete, with finish as existing, and color to be similar to existing concrete. Granite Pegasus to be removed and replaced with sand or lite broom finish black or dark charcoal concrete. Rectangle granite tiles to be removed leaving in place both stainless steel expansion circles around the Pegasus logo. Grey colored concrete to replace Rectangle granite tiles. All seams of new to old concrete shall be at an existing expansion cut or joint. Wire mat to be used in areas of new concrete where possible. Concrete to meet UCF Standards for sidewalks of 6” depth. to provide and use orange plastic barricade fencing around work area during project operations. Contractor to provide an ADA access map around area of work, reflecting detour of pedestrian traffic around area with access to Arena, and provide and install detour signs reflecting detour routes.
UCF Additions Financial Arena Front Walkways (RFP)
zip
Release
Mar 11, 2025
Close
Mar 31, 2025