Town of Cary
Work consists of draining two existing ponds, breaching the earthen embankments, installing temporary bypass pipes and diversion channels; constructing new concrete riser and box outlet structures, low flow drain, trash racks, and outlet protection; backfilling and raising the existing earthen embankments up to 3'; restoring approx 280' of stream; installing a 370' regenerative stormwater conveyance outfall channel; grading and paving approx 2,800' of greenway and associated appurtenances.
354-SW25-28 Invitation to Bid ITB Twin Lakes Dam Rehabilitation
Release
Jan 22, 2025
Close
Mar 05, 2025