Town of Fountain Hills
The work consists of 15 ea Demo - Tree Removal - Palms Only; 1 ea Demo - Stump Removal; 26,740 sf Demo - Turf Removal; 2 ea Demo - Shrub Removal; 3,600 ea Demo - Existing Decomposed Granite Removal; 20 ea Trees - 15 Gallon; 30 ea Shrubs - 5 Gallon; 30 ea Groundcover - 5 Gallon; 31,430 sf Decomposed Granite 1" Screened Yavapai Coral by MDI Rock; 1 ea Irrigation Controller - I2CF-800-M, 8 Station, ICC2 Pedestals, with Wireless Valve Output Module for ICC2/HCC Controllers; 2 ea WVL100 Single-station Wireless Valve Link (antenna included); 1 ls Traffic Control; 26,740 sf Irrigation system (PVC drip) Included filter and pressure regulator (existing turf valve convert to drip valve). See attached file.
Turf Replacement - Fountain Hills Blvd
and Shea Blvd
Release
May 16, 2025
Close
Jun 11, 2025