Retrieving RFP details
Release
Close
San Francisco Dept. of Airports (Airport Commission) c/o San Francisco International Airport
Design-Builde - Furnishing of hollow metal frames installed by others, and furnishing and installation of hollow metal doors and hardware. The scope also includes furnishing, installation, and maintenance of temporary doors and hardware for construction use.
San Francisco Dept. of Airports (Airport Commission) c/o San Francisco International Airport
This replacement 120,000 SF, single-story cargo facility has been planned with approx. 95,000 SF of cargo area, and 25,000 SF of mezzanine office space along with landside maneuvering depth from west field road for approx. 30 trucks. The project also has an ancillary ground service equipment (gse) maintenance facility (building 742) of approx 17,000 SF on site, but not physically connected, to the cargo facility. In order to construct the new facilities, demolition of the existing building 730 will be required.
San Francisco Dept. of Airports (Airport Commission) c/o San Francisco International Airport
Project consists of furnish and install 40 overhead coiling doors at building 720.1 and 21 overhead coiling doors at building 742, and 1 overhead coiling fire shutter at b720. 1. This scope also includes but is not limited to furnishing and installation of 26 sets of dock bumper and leveler sets. In addition, scope includes but is not limited to furnishing and installation of 5 pedestrian turnstiles.
San Francisco Dept. of Airports (Airport Commission) c/o San Francisco International Airport
Furnish and install all flooring finishes, stair finishes, and wall tile for building 720.1 and 742. The scope includes but is not limited to approx. 1,300 SF of floor tile, 2,000 SF of wall tile, 5,100 LF of rubber base, 500 SF of walk-off mats, and 110,000 sf of sealed concrete. All caulking, sealants, control joints, transition strips, thresholds, trim and accessories.
Release
Oct 10, 2025
Close
Nov 03, 2025