Retrieving RFP details
Release
Close
Osceola County School District
Work includes remove and dispose the existing rubberized track surface, covering an approx area of 43,000 sf; thickness: 1/2" (13mm) or as specified; polyurethane-based primers specifically formulated to be compatible with the base and track surfacing material; the line marking paint shall be polyurethane-based, single component moisture cured paint specifically manufactured to be compatible with polyurethane synthetic track surfaces; the synthetic track surfacing system shall be laid on a sub-base designed and approved by a licensed engineer. The successful bidder shall provide compaction test results of 95% or greater for the installed sub-base and the finished asphalt; etc, see outside link.
Mount Vernon Township High School District 201
Work to include the installation of approx. 58,500 SF of athletic track resurfacing system, repainting of all track striping and event markings, all associated cleaning and preparation of existing athletic track surface, and any necessary track base repairs.
Spring Lake Public School District
Work includes high school addition, renovation, and athletic improvements. See outside link.
Hawaii Department of Education
High school track and field improvements.
Release
Nov 03, 2025
Close
Dec 03, 2025