City of Grand Prairie
Work includes 1 LS of site preparation; 1 LS of condition survey; 1 LS of construction staking; 1 ls of as-built survey; 1 LS of traffic control with barricading per city requirements; 100 LF of silt fence, installation to city standards and maintenance throughout project; 4 EA of type 2 rock check dam, installation to city standards and maintenance throughout project; 1 EA of construction entrance to city standards and maintenance throughout project; 1 EA of concrete truck washout area to city standards w/ maintenance throughout project; 1 ls of removal and reinstallation of obstructions (signs, landscape, etc.); 135 LF of trench safety for wastewater main per city requirements; 60 LF of sawcut for wastewater utility trench. See outside link.
Release
Feb 21, 2025
Close
Mar 11, 2025