City of Carmel
The work consists of 1 LS Mobilization and Demobilization; 1 LS Clearing of Right of Way; 32,100 DOL Storm Water Quality Management Budget; 259 SYS Subgrade Treatment, Type II; 652 SYS Subgrade Treatment, Type III; 993 CYD Structure Backfill, Type 1; 41 CYD Flowable Fill for Street Cut Repair; 131 SYD Geogrid, Type IB (Undistributed); 109 CYD Compacted Aggregate, No. 53; 2,180 SYD Milling, Asphalt, 1 1/2 IN; 163 TON QC/QA HMA, 3, 70, Surface, 9.5mm; 1 TON Asphalt for Tack Coat; 370 SYD Concrete Cap for Street Cut Repair - 11.5”; 2,071 SYD Raised Crosswalk; 7,867 SFT PCCP, Decorative; 237 TON HMA for Sidewalk. See attached file.
Towne Road Pedestrian Crosswalk Improvements
zip
Release
May 07, 2025
Close
Jun 04, 2025