Town of Davie
Work consist of 25 LF of removal of 5' high concrete wall & foundations, removal of fence enclosure, removal of misc. Demolition material, 135 LF of 6" PVC feeder (incl. Horizontal directional drilling), 2,460 LF of 6" PVC feeder (incl. Horizontal directional drilling), 58 LF of 6" PVC feeder (incl. Horizontal directional drilling), 245 LF of 2" PVC service (incl. Horizontal directional drilling), 4 ea of switchgear pad, 650 LF of 4" PVC main conduit (incl. Horizontal directional drilling), 1,585 LF of ) 4" PVC main conduit (incl. Horizontal directional drilling), 3 ea of install 24" x 30" handhole. See attached file.
Town Hall Undergrounding Phase II