Summary

Provide potential transformer; structure 69kv switching, galvanized steel complete with anchor and erection bolts; structure, 15kv switching. , galvanized, complete with erection and anchor bolts; structure, 69kv. Bus support, galvanized, complete with anchor bolts, leveling nuts, & erection bolts, 19' bus height; structure, 15kv. Bus support, galvanized, complete with anchor bolt, leveling nuts & erection bolts, 14 feet bus height, single column; addition of 69. 35/13. 2kv transformer to existing foundation location; addition of one (1) 69kv sf6 breaker; addition one (1) 69kv,1200a group-operated disconnect switch with pedestal; addition of one (1) 15kv transmission circuit breaker. See attached file.

Files

Totten Substation Expansion Steel Structures Fabrication (RFP) *REBID*

zip

Details

Release

Oct 01, 2024

Close

Apr 25, 2025

Contacts

Source

Get a Free RFP Download