Logo

starbridge

Book a Demo
RFPs/Tombs Field Locker Rooms Renovation

Tombs Field Locker Rooms Renovation

United States Merchant Marine Academy

Summary

Entrance foyer: a. Major carpentry work required for patching and painting to include cove base replacement. B. Minor plumbing work. Removing and replacement existing rubber tile floor completely. F. Inspect and repair/replace as needed, all electrical switches, outlets and wiring. To include the light fixture(s) replace with LED. See outside linked file.

Files

No files

Details

Release

Aug 09, 2024

Close

Sep 13, 2024

Contacts

Source

Get a Free RFP Download