Lodi Unified School District
Site preparation for a future new per-manufactured steel non-school barn (by others) open on 3 sides, (size 120'-0" x 35'-0"), including: grade area and prepare site for future concrete pad (approx. 4,200 sf), install new septic tank for stall washout, install drainage trough connecting to the new septic tank, install underground utilities to stub up at pad location, install two (2) accessible parking stalls along the new path of travel, create an accessible path of travel from the public right of way to the future building.
bulk
zip
Release
Aug 10, 2024
Close
Sep 17, 2024