Dept of the Army, US Army Corps of Engineers, CESWT- CT
Demolition and disposal of the existing temporary wall structure, existing wood plank flooring at the Generator Room Level adjacent to the temporary wall structure, and the design and construction of a floor grating system on the Generator Room Level as well as a new permanent wall on the north side of the powerhouse.
Release
May 23, 2024
Close
Sep 20, 2024