New York State Thruway Authority
Provide pavement rehabilitation, safety improvements and miscellaneous work. Perform vertical clearance improvements. Replace pier protection at the NY Route 33 overpass. Replace median drainage trunkline including drainage structures. Replace existing temporary concrete median barrier with permanent concrete single slope barrier. Replace 5 overhead span sign structures and replace 1 cantilever sign structure. Mill 2" of asphalt and replace with new 2" of asphalt. Replace existing guiderail with new guiderail at various locations. Replace existing culvert end sections, clean inverts, and clean ditches of various small culverts. Replace various ground mounted traffic signs. Replace all roadway pavement striping. Restore disturbed areas and clean-up as directed by the Engineer.
d215028_tab25-13_proposal-book-1-of-1
Illinois Tollway
The work under this contract includes bridge reconstruction, bridge rehabilitation, construction of new pavement and milling and overlaying existing pavement, guardrail removal and installation, earthwork, grading, erosion and sediment control measures and landscaping, drainage, Intelligent Transportation System (ITS) infrastructure, maintenance of traffic and other miscellaneous work.
New York State Department of Transportation
Pavement marking project 25 - nighttime work.
Clark County
The project will complete improvements to the Clark County Chelatchie Prairie Railroad between milepost 14.12 to 26.9, but the current work will focus on the roadbed rehabilitation of the railroad from Milepost 21.50 to Milepost 23.16. Improvements will primarily focus on the replacement of deteriorated cross ties, addition of ballast, and rehabilitation of switch ties and surfacing.
Release
Oct 21, 2025
Close
Nov 19, 2025