Retrieving RFP details
Release
Close
New York Dormitory Authority
Gage hall renovations and associated asbestos and hazardous material abatement. The scope of work includes but is not limited to Asbestos Abatement and hazardous materials removal, mechanical upgrades, accessibility improvements, card access and fire protection upgrades in Gage Hall.
New York Dormitory Authority
Provide professional construction management services during construction phases of the project using a construction manager-build ("CM-build") project delivery method. The project scope of work generally includes, but is not limited to asbestos abatement, selective demolition, concrete, masonry, metals, interior finishes, openings, roofing, finishes, specialties, furnishings, roofing, fire suppression, plumbing, mechanical, electrical, communication, fire alarm, sitework, and exterior improvements. Project shall include, selective demolition, asbestos-containing material removal and hazardous waste removal, including removal of ceiling plaster and of built-in wardrobes as ACM. Installation of building-wide fire protection system, construction of soffits and new finishes as required by removals. In addition, the demolition and reconfiguration of the existing bathrooms of Capen Hall shall include new partitions, doors and hardware, finishes, fixtures, and toilet accessories. The scope of work also includes the reconfiguration of the sprinkler system into the bathrooms and replacement of the existing exhaust system with roof mounted Energy Recovery Ventilator system including supply and return ductwork. The demolition and reconstruction of existing bathrooms shall include finishes and fixtures, domestic risers and distribution and sanitary risers, lighting, power, and fire alarm systems. Upgrades to existing hydronic piping, valves, and pumps are also included. In addition, the scope of work includes the renovation of offices, conference room, and resident director apartment and office. Reconfiguration and new finishes for the first-floor business suite in the south wing with a new exterior entrance. Finishes shall include, but not limited to, resilient flooring and painting including tile, carpet and signage. Electrical and fire alarm work as required by removals. Removal of existing bedroom doors and frames. Installation of doors and frames, including a new hard wired card access system.
The Interlocal Purchasing System (TIPS)
Provide Asbestos and other Hazardous Contaminant Abatement and Disposal Services .
New York Dormitory Authority
Demolition and renovation of existing labs 104, 128, 232, 245, and 295 at the hall and demolition of existing labs E117 and E255 at the science building. Provide new partitions, doorways, ceilings, lab casework, millwork, equipment and finishes. Provide equipment supports through existing roof for new rooftop mechanical equipment. Revise ductwork distribution system and fume hood exhaust system in renovated laboratory in Science Building. Provide new fume hoods per equipment schedule. Provide controls integration into campus system. Replace plumbing distribution for domestic water, laboratory gases, and sanitary in renovated laboratories. Extend existing fire sprinkler systems to serve renovated labs. Replace electrical distribution, lighting, and fire alarm systems in renovated laboratories.
Release
Oct 17, 2025
Close
Nov 19, 2025