Retrieving RFP details
Release
Close
City of New Braunfels
Substation acceptance & relay testing.
Peabody Municipal Light Plant
Work includes approx. Furnish twelve (12) simplex relay and control cabinets, one (1) annunciator cabinet, and one (1) field SCADA cabinet.
Allegheny County Port Authority
Substation Transformer Oil Sampling & Testing.
Maryland Transit Administration
This Contract is for the replacement of 26 existing prefabricated traction power substations. The replacement work includes removal of the existing prefabricated type substation enclosures, and design, fabrication, factory testing, delivery, installation, field testing acceptance testing and commissioning for new 2 MW prefabricated-type traction power substations. The work also includes the addition of 750 Vdc pad-mounted load-break disconnect switches and modifications to existing 750 Vdc duct bank and cable systems to interface the new substations and load-break switches with the existing 750 Vdc power distribution systems at all 28 prefabricated Substation locations.
Release
Oct 08, 2025
Close
Nov 05, 2025