City of Miami Beach
The work consists of replacing two out-of-service water mains with new 20-inch and 16" HDPE water mains installed via HDD method requiring four HDD pits and installing ductile iron pipe ranging from 8-inch diameter to 20-inch diameter, installed via open-cut.
Release
Aug 13, 2024
Close
Sep 27, 2024