Work includes enclosing of an existing open loading dock area that currently has a portion covered with a standing seam metal roof and chain-link fence enclosure, demolition of concrete will be required to allow for the installation of new steel column footings, enclosing approx 1,650 SF of space and will include new electrical, HVAC, and sprinkler system, overhead coiling door required, exterior walls will consist of metal stud and brick veneer, and the roof will match the existing standing seam metal roof.