City of Spring Hill
Work includes installation of spray applied pipe liner and/or folded thermoform PVC pipe liner or engineer approved equal, within approx. 578 LF of existing stormwater piping. This installation includes all labor, materials, furnishing, site preparation, site cleanup, pipe jetting and repairs prior to installation, as well as pre and post installation inspections of the pipes by closed circuit television (CCTV). See attached files.
Stormwater Pipe Lining
zip
Release
May 25, 2025
Close
Jun 17, 2025