City of Roswell
The Project includes the following Work: Rehab double barrel 60 inch Cross drain conveyance system that carries an active creek under Bowen Road. Also construct a new headwall to improve and stabilize slope and mitigate erosion to reduce risks to roadway and install outfall protection to help alleviate downstream issues. Construct a new intake headwall to mitigate erosion on the upstream side and improve creek flow.
ITB 24-268-A - pub - STORMWATER CONSTRUCTION FOR BOWEN RD
A
Release
Aug 26, 2024
Close
Sep 23, 2024