City of Charlotte
Work includes 500 CY borrow excavation; 75 LF 24" RC pipe culverts, class IV; 100 LF pipe cleaning - on screen light (15" - 24"); 400 SY milling asphalt pavement, 0.0" to 3.0"; 15 EA masonry drainage structures; 250 SY 4" concrete sidewalk or pad; 1,500 SY seeding and mulching; 50 LF 1" copper water tubing, type K; 40 LF 4" DI restrained joint water pipe, PC 350; 40 LF 6" DI restrained joint water pipe, PC 350; 400 LB DI restrained joint water pipe fittings. See outside link.
Release
Sep 04, 2024
Close
Oct 01, 2024