Retrieving RFP details
Release
Close
City of Topeka
Work includes the replacement of primarily 2” (approx. 560 LF), 6” (approx. 4,000 LF), and 8” waterline (approx. 2,200 LF) by HDD and or conventional excavation and backfill. This project also includes the replacement of 12” waterline crossing 41st Street on the south end of the project. The replacement of water services, valves, fittings, fire hydrants, and other miscellaneous appurtenances are also included with the work.
3281
zip
City of Social Circle
Work includes water main replacement.
Lake County - Special Districts Dept.
Replace and abandon in-place the existing 4" steel water main, the 8" steel water main, and a portion of 8" asbestos cement pipe; upgrading the abandoned water main infrastructure with approx. 781 LF of new 8" PVC C-900, 75 LF of 6" PVC C-900, including but not limited to installation of six 8" gate valves, three 6" gate valves, four tie-in's, two fire hydrants, fifteen 1" water services utilizing existing meters, and one 1" dual water service. The existing water lines shall be kept in operation until the new water line, new fire hydrants and new water services are completed. The switch to the new system shall be made with limited interruption of water services to the existing customers.
City of Florence
Water main improvements project.
Release
Oct 24, 2025
Close
Nov 20, 2025