Retrieving RFP details
Release
Close
City of Mellen
Replacement of 1" water services, and associated surface restoration.
City of Boulder City
Work includes 5,460 SF removal of asphaltic concrete; 5,460 SF hot asphalt patching min 3" section; 39 EA 3/4", 1" and 1-1/2" water service replacements; 5 EA service abandonment & wet tap.
City of Boulder City
Work includes removals of existing 3/4" water services, relocation of existing service lines as needed to attain 4' separation between water and sewer laterals and make the service line perpendicular to the water main, connection to existing or relocated corporation stop at the main with a brass adapter, and installation of new copper water service (size to match existing) from the main to the meter for 34 water services within Boulder City. This work shall also include installation or replacement of water meters, meter boxes, and/or Encoder Receiver Transmitter modules (ERTs) for locations specified (these items will be supplied by the City). This project shall include asphalt replacements.
City of Boulder City
Work includes removals of existing 3/4" water services, relocation of existing service lines as needed to attain 4’ separation between water and sewer laterals and make the service line perpendicular to the water main, connection to existing or relocated corporation stop at the main with a brass adapter, and installation of new copper water service (size to match existing) from the main to the meter for 30 water services within Boulder City. This work shall also include installation or replacement of water meters, meter boxes, and/or Encoder Receiver Transmitter modules (ERTs) for locations specified (these items will be supplied by the City). This project shall include asphalt replacements. See attached file.
Release
Oct 14, 2025
Close
Oct 30, 2025