Washington State Department of Transportation
Constructing a new welding shop, paving, potable water, sanitary sewer, electrical upgrades and other work includes 5,100 LF removing paint line, hazardous material handling and disposal, 580 CY hazardous material excavation incl. haul, 10 CY roadway excavation incl. haul, 150 LF testing storm sewer pipe, 150 LF solid wall PVC storm sewer pipe 4" diam., 230 LF trench drain, 360 LF testing sewer pipe, 3 EA sewer cleanout, 140 LF PVC sanitary sewer pipe 4" diam., 220 LF PVC sanitary sewer pipe 6" diam., 282 LF ductile iron pipe for water main 8" diam.
SR 305, Eagle Harbor Maintenance Facility Welding Shop Building Replacement
zip
Release
Apr 18, 2025
Close
Jul 16, 2025