Logo

starbridge

Book a Demo
RFPs/SR 109 At Long Hollow Pike SB Ramp and Signal Improvements

SR 109 At Long Hollow Pike SB Ramp and Signal Improvements

City of Gallatin

Summary

Work includes 32 LB perforated/knockout square tube post; 1 LS sign removal (r1- 2, sign & post); 20 LF plastic pavement markings (stop line); 18 SF removal of pavement marking (yield line); 2 EA signal head assembly 9130 a3 pole mounted); 300 LF signal cable - 7; 180 LF conduit 2" dia (directional bore, PVC schedule 80). See attached files. Conductor

Files

bulk

zip

Details

Release

Oct 31, 2024

Close

Nov 14, 2024

Contacts

Source

Get a Free RFP Download