Logo

starbridge

Book a Demo
RFPs/Spider Lake Loop ATV Trail Bridge SENW Sec 2 T37N-R10W

Spider Lake Loop ATV Trail Bridge SENW Sec 2 T37N-R10W

Washburn County

Summary

DESIGN-BUILD, and place a clear span bridge on wood sills over a wetland on part of the Spider Lake ATV Loop in Section 2 T37N-R10W.Bridge to be 30 feet long, a minimum of 12 feet wide, and a load capacity minimum of 25,000 pounds (AASHTO H- Vehicle Loading). Bridge to be set on s 12” x 12” by 12’ treated wood sills. Washburn County to remove and dispose of existing bridge and bridge materials

Files

RFP-Spider-Lake-Loop-ATV-Trail-Bridge-1

pdf

Details

Release

-

Close

Apr 15, 2025

Contacts

Source

Get a Free RFP Download