Summary
Work includes random clearing 692 station, removal of asphalt pavement, all depths 1,454 SY, removal of guard rail including post, blockouts & hardware 512 LF, removal of traffic stripe 980 LF, excess excavation, lvm, ah 271 CY, geotextile stabilization, type v, non-woven 1,625 SY, granular material, lvm, class 6, group d 5,822 CY, fine milling of bituminous pavement, all depths 5163 SY, saw cut, full depth 2048 LF, guard rail, class a, type 1, 'w' beam 325 LF, special sections, guard rail bridge end connector 4 EA, additional construction signs, temporary traffic stripe, skip yellow 4 mile, delineators, guard rail, white 16 EA. See attached file.