Retrieving RFP details
Release
Close
City of Naperville
Work consists of demolition and disposal of existing standby generator, generator concrete pad, sidewalk panels, control devices, ATS in pump room, and associated electrical cables; Install new generator, concrete pad, and bollards outdoor, ATS/disconnect combined unit and concrete pad in the pump room and associated electrical and control wires.
City of Branson
Provide generator and bypass pump maintenance and repair services for the period commencing January 1, 2026, through December 31, 2026.
Matanuska Electric Association, Inc./MEA
Project called MEA Dispatch Generator Replacement. Construction and commissioning of a new 80kW, Diesel fired Generator and load bank to replace the existing 60kW, Natural Gas fired Generator along with all appurtenant civil, mechanical, and electrical improvements for the MEA Dispatch Center Facility. The existing ATS will be reused with the new generator, and the new generator must interface with the existing ATS controls. A temporary roll up generator must be provisioned and set up as a backup power source while the new generator is being installed.
North Slope Borough
Provide Districtwide Generator Replacement and Upgrades.
Release
Oct 24, 2025
Close
Nov 24, 2025