City Of Lebanon
Work includes 400 LF furnish and install 1" type k copper tubing; 12 EA furnish and install 1" corporation stop; 12 EA furnish and install 1" curb stop with box; 2 EA remove and abandon top section of valve box and fill bottom section with flowable fill; 800 LF fill abandoned 6" water main with flowable fill and cap; 1 EA cap existing 6" water main; 45 CY excavation of unsuitable material and replacement backfill; 10 CY trench excavation - ledge; 10 CY boulder removal > 1. 5 cy. See outside link.
bulk
zip
Release
Sep 18, 2024
Close
Oct 11, 2024