Retrieving RFP details
Release
Close
City of Tallahassee
Provide utility-scale solar generation projects (2.2 mw to 74.9 mw) and battery energy storage systems (10 mw - 25 mw with 4-hour duration) to meet its interim clean energy goal of adding at least 120 mw of clean, renewable energy supply capacity to its electric grid by 2030.
Solar Power Generation and Energy Storage for Electric Utility
zip
Allegheny County Sanitary Authority
Contract will add a solar power electrical generation system. The system will include multiple roof mounted solar panel strings, a combiner, dc to ac power invertor, main disconnect, associated cabling and a monitoring system.
City of Vineland
Two (2) types of circuit breakers that are utilized in the city. Specification: general electric (GE) power/vac 15kv circuit breaker (and) EATON Magnum DS (MDS480) circuit breaker. The GE power/Vac is the circuit breaker used for BRUSH 64 MW generators. The Eaton magnum DS is used for the generation sites' station service transformers.
University Of California Merced
Seeking a qualified solar energy photovoltaic (pv) system and battery energy storage system (bess) provider that shall finance, design, install, own, operate and maintain a solar pv and bess system on uc mercedowned property and sell electrical output to uc merced on a fixed cost per kwh.
Release
Oct 15, 2025
Close
Dec 31, 2025