US Army Corps of Engineers (USACE), Galveston, Civil Works
Perform pipeline dredging of the SNWW from the Neches Canal to the Neches River Channel. The work consists of channel improvements for the Sabine-Neches Canal (Station 62+235 to 121+517) and the Neches River Channel (Station 0+00 to 355+00) inland reaches as part of the SNWW Channel Improvement Project (CIP). The channel deepening associated with Contract 4 of the SNWW CIP will require dredging approx. 10,559,000 cubic yards (CY) of material, approx. 2,860,00 CY of which will be maintenance material, and 7,669,000 CY will be new-work material.
Release
Feb 03, 2025
Close
Feb 14, 2025