Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Port Of Seattle
The expansion consists of civil work, retaining wall, pavement, gate upgrades and vehicle perimeter road improvements to allow large equipment to access the site, and also includes drainage piping to route melt runoff to Lagoon 3, SEA includes 840 LF IWS - 12" dia ductile iron pipe, 2 EA IWS - remove and replace lagoon liner and geocomposite, 2 EA IWS - lagoon pipe boot, 122 LF IWS - 6" dia PVC drain pipe, 1,252 LF IWS - 6" dia PVC perforated underdrain pipe, 37 LF IWS - 4" dia ductile iron drain pipe.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
County of Kauai
Gas collection and control systems (GCCS) for the vertical expansion of the landfill Phase II.
Posted Date
Nov 3, 2025
Due Date
Dec 9, 2025
Release: Nov 3, 2025
County of Kauai
Close: Dec 9, 2025
Gas collection and control systems (GCCS) for the vertical expansion of the landfill Phase II.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Anne Arundel County
Expansion of the existing 15-MGD water treatment plant (with 20-mgd headworks) on Riedel Road, Crofton Meadows, Maryland to 20-MGD nominal capacity. The work includes, but is not limited to, constructing new aerators, flocculation basins, sedimentation basins, filters, thickener, clearwell, high lift pumping station upgrade, backwash holding tank, backwash surge tank upgrades, generators, chemical systems upgrade, yard piping, dewatering, grading, site work, paving and landscaping. Furnish and install all equipment, materials, labor, structures, site work, piping, test pits, testing, accessories, appurtenances and all other required work.
Posted Date
Nov 3, 2025
Due Date
Jan 13, 2026
Release: Nov 3, 2025
Anne Arundel County
Close: Jan 13, 2026
Expansion of the existing 15-MGD water treatment plant (with 20-mgd headworks) on Riedel Road, Crofton Meadows, Maryland to 20-MGD nominal capacity. The work includes, but is not limited to, constructing new aerators, flocculation basins, sedimentation basins, filters, thickener, clearwell, high lift pumping station upgrade, backwash holding tank, backwash surge tank upgrades, generators, chemical systems upgrade, yard piping, dewatering, grading, site work, paving and landscaping. Furnish and install all equipment, materials, labor, structures, site work, piping, test pits, testing, accessories, appurtenances and all other required work.
AvailableCity of El Paso
The City of El Paso seeks qualified firms for geotechnical and materials testing services for Phase 1 of the Advanced Manufacturing District at El Paso International Airport. Services include geotechnical engineering, soil investigation, and construction material testing. The project involves a 30-acre development with a 50,000 sq. ft. Innovation Factory and a 100,000 sq. ft. multi-tenant building.
Posted Date
Nov 7, 2025
Due Date
Dec 5, 2025
Release: Nov 7, 2025
City of El Paso
Close: Dec 5, 2025
The City of El Paso seeks qualified firms for geotechnical and materials testing services for Phase 1 of the Advanced Manufacturing District at El Paso International Airport. Services include geotechnical engineering, soil investigation, and construction material testing. The project involves a 30-acre development with a 50,000 sq. ft. Innovation Factory and a 100,000 sq. ft. multi-tenant building.
AvailableCity of Phoenix
Pprovide architectural and engineering services for terminal 3 and terminal 4 parking garages at the Phoenix sky harbor international airport. Services may include design and possible construction administration and inspection.
Posted Date
Nov 20, 2025
Due Date
Dec 12, 2025
Release: Nov 20, 2025
City of Phoenix
Close: Dec 12, 2025
Pprovide architectural and engineering services for terminal 3 and terminal 4 parking garages at the Phoenix sky harbor international airport. Services may include design and possible construction administration and inspection.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →