Bartow County
Replacement of 6" PVC water line with approx. 3,200 LF of 6" DIP water line and installation of 240 LF of 2" Municipex water line to provide water service and fire flow to the residential area. The existing water system will remain operational until installation and testing of the new waterline system is completed and approved. Two cut-in connections on the existing 6" DIP main are required. Most of the waterline trenching is outside of improved surface areas. The total disturbed area is estimated to be approximately 0.25 acres.
Skyview Drive Waterline Improvements
zip
Village of Briarcliff
Work includes 12" waterline improvements including appurtenances, yard piping, valves. Construction of approx., 8,400 ft of 12" waterline; 5 EA of stabilized construction entrance; 10 ea of tree protection; revegetation, seeding; 5 EA of rock berm; 225 LF of 6" PVC c900, dr18 pipe, fittings, restraint, complete and in place; 6 EA of gate valves, 12" diameter; 3 EA of fh hydrant assembly; 3 EA of air / vacuum release valves. See outside link.
Southern Perry County Water District
Project consists of waterline improvement.
City of Henderson
Reclaimed waterline improvements project includes the rehabilitation of 9,850 LF 24"mlcp rwl using flexible fabric reinforced pipe. Work within this rehabilitated section includes improvements to air vacuum/air release valves and laterals, blowoff valves and laterals, cathodic protection test stations and anode bags, and replacement of inline gate valves inside of new valve vaults. The 24" mlcp rwl will be converted to open-to-atmosphere gravity flow by installing a flowmeter and control valve at gvips, removing/converting downstream inline isolation valves to access manholes.
Release
Oct 02, 2025
Close
Nov 03, 2025