Retrieving RFP details
Release
Close
Howard County
Perform replacement of deteriorated sidewalks, curbs, driveway aprons, and upgrade of existing ramps and curb cuts in compliance with Americans with Disabilities Act 1990 (ADA) at various locations.
City of Raleigh
The complete removal and disposal of existing sidewalk access ramps as identified by the City and replacement with upgraded ADA-compliant access ramps within the City areas under its jurisdiction. The removal and replacement of sidewalk panels, curb, and gutter as identified by the City in accordance with project specifications. The restoration of all disturbed areas, including backfilling, grading, seeding, and mulching, with only NCDOT-approved seed mixtures to be used.
City of Bridgeport
Work includes per CY excavation, disposal; per SF 8" concrete driveway apron; per SF 5" concrete sidewalk with wire mesh; per SF brick sidewalk on concrete base; per LF granite curb 5" x 18"; per LF reset existing granite curb ; per SF permanent pavement repair; per EA tree gate installed; per EA tree pit includes tree; per sf 3' wide grass strip; per LF 18" concrete sidewalk curb; per LF 12" concrete driveway curb; per EA trash receptacle; per EA sidewalk bench; per LF 1' dia PVC conduit; per LF 1' diameter rigid metal conduit; per ea standard light & foundation, per ea street light cable & electrical service. See outside link.
Michigan Department of Technology, Management and Budget
Traffic signal modernization and concrete sidewalk ramp upgrades.
Release
Oct 24, 2025
Close
Nov 19, 2025