Retrieving RFP details
Release
Close
City of Boston
Sidewalk & Infrastructure Improvements.
ADV for BPDA Sidewalk and infrastructure Improvements
City of Port Townsend
Work includes: Remove existing sidewalk and asphalt pavement; excavate roadway and place crushed surfacing; construct cement concrete curb and sidewalk; install ADA-compliant curb ramps, gravity block wall, catch basins, and permanent pavement markings; relocate existing sign; restore disturbed areas.
City of Mount Dora
Provide certain commercial construction services. Street slope stabilization, erosion control and sidewalk improvements.
West Lampeter Township
The principal items of work to be performed under the contract are: 1) site demolition; 2) full-depth pavement removal; 3) full-depth pavement shoulder widening; 4) installation of concrete curb and sidewalk; 5) installation of ADA curb ramps; 6) modification to existing stormwater collection and conveyance system; 7) installation of new stormwater collection and conveyance system; 8) driveway pavement restoration; 9) site grading, topsoil and seeding; 10) pavement markings and signage; and 11) work of similar nature.
Release
Oct 13, 2025
Close
Nov 05, 2025