Summary
The work to be done in general consists of mobilization; preparatory work, securing the work area for public safety, and site cleanup daily, clearing and grubbing, traffic control; storm water pollution control program; earthwork; potholing of existing utilities; open trench replacement of sanitary sewer mains and laterals; pipe bursting of sanitary sewer mains and laterals; sewer cleanout replacement; manhole rehabilitation; slurry seal; traffic striping and markings; 8,323 LF of CCTV inspectionl 2,830 LF of replace existing 6" and 8" VCP with new 8" HDPE by pipe bursting; 128 LF of replace existing 6" and 8" VCP with new 8" PVC by open cut, 67 LF of replace existing 16" VCP with new 16" PVC by open cut; 2,683 LF of rehabilitate existing 8" SS bt CIPP lining and all other work shown on the plans and as specified in the project manual and all other work as specified in these special conditions, technical provisions, and as shown on the plans.