Retrieving RFP details
Release
Close
Elsinore Valley Municipal Water District
Work includes approx 6,230 LF 8" PVC SDR35 sewer pipe; 2,070 LF 8" HDPE DR-21 sewer pipe; 6,900 LF tier 2 sewer lateral connection; 1,950 LF electrical conduit; 1 Ls erosion control. See outside link.
Elsinore Valley Municipal Water District
Project consists of installing approx 12,930 LF of gravity sewer to serve about 127 residences. In addition to the gravity main system, the project includes on-site lateral installation, grinder pump installation where required, connections to each property, and septic tank destruction.
City of Modesto
Project scope is to install on-site (private property) sewer laterals and cleanouts to connect residents currently utilizing septic systems to the city's sewer system. This project will also provide for the demolition and abandonment of existing on-site septic tanks
City of Modesto
Provide survey services as part of rouse/Colorado neighborhood - area 9 septic to sewer conversion project.
Release
Sep 27, 2025
Close
Nov 20, 2025