Greater Peoria Sanitary District
The project consists of improvements to an existing secondary clarifier, including removal and replacement of the existing center support column, scraper rake arms, drive cage, drive unit, center access bridge, and related conduit, control and monitoring equipment, and ancillary work. See outsid elink
City of Kenosha
The project consists of constructing: replacement of primary clarifier sludge mechanisms and drives; replacement of MCC10-1A/1B in its existing location; temporary power panel/starter arrangement to maintain operation of clarifier drives during MCC replacement; provide new conduit and wiring for clarifier drives; replacement of primary clarifier effluent troughs and weirs; crack repair and concrete rehabilitation; bid alternate no. 1 - fiberglass enclosures.
Las Virgenes Muncipal Water Dist
Work includes 1 LS demolition work; clarifier metal fabrication & recoating work (effluent launders & inlet diffusers): 58 EA sand blasting and recoating of existing effluent launders; 6 EA fabricate and install new effluent launders; 15 EA sand blasting and recoating of existing inlet diffusers; 15 EA fabricate and install new inlet diffusers; 1 LS scum piping; 1 ls launder drain butterfly valves; 1 LS launder drain repair couplings; concrete repair work: 62. 37 CF level 1 concrete repair 4; 176 LF epoxy crack injection 6; 96 ea abandoned anchor bolt repair. See attached file.
City of Cleveland
Secondary site improvements- cycle j.
Release
Oct 06, 2025
Close
Nov 06, 2025