City of Santa Barbara
Construction of a new three-story 64,000 SF Police Station and the associated 81,000 SF parking structure to accommodate 244 parking spaces at the existing 1.61-acre Cota Commuter Parking Lot. Each structure would also have a subterranean level. Eight additional surface parking spaces would be provided. Existing Police operations, currently located at four separate sites, would be consolidated at the new Project site. The grading includes 22,000 CY of export. Final Cleaning, Scaffolding, Construction Parking, Erosion Control & SWPPP, Surveying, Concrete Reinforcing, Polished Concrete, Precast Concrete T, Unit Masonry, Stone Veneer, Structural Steel Framing, Prefabricated Stairs, Rough Carpentry, Cross Laminated Timber, Architectural Woodwork, Waterproofing, Building Insulation & Firestopping, Floor Moisture Vapor Emission Control, Roofing, Sheet Metal & Metal Panel, Roof Pavers, Coiling Doors, Elevator Smoke Curtains, Glass & Glazing, Cement Plastering, Tiling, Acoustical Ceilings,Resilient Flooring & Carpet, Painting, Intumescent Fireproofing, Specialties, Signage, Folding Panel Partition, Parking Control Equipment, Window Treatment, Elevators, Fire Suppression, Plumbing, HVAC, Electrical, Fire Alarm & Low Voltage, Photovoltaic Systems, Earthwork & Site Demolition, Earth Retention Shoring, Site Concrete, Pavers, Pavement Markings, Fences & Gates, Landscape & Irrigation, Site Utilities.
Release
Aug 20, 2024
Close
Sep 20, 2024